Asbestos Management for Strata and Commercial Buildings Part 2

asbestos management for beds andcommercial builds “thats part” 2 of the line that we were looking at before where in part 1 we were looking at the asbestos safety and eradication agency so that’s the agency they throw in for going rid of the asbestos in Australia so that’s the central authority that’s looking after that but what we’re gonna into was the managing for the commercial-grade structures and their requirements that in there and we’ll go through the other report a little bit later on Okay, so any house before 2003 is required to havea asbestos register and it should be reviewed once every 5years to keep that up to date that’s where we’re talking about the obligations under that workplace health and safety Act so whoever is in the domination of the workplace he’s a responsible person and could beliable for not managing the workplace properly so that’s why we need to reduce the risks to the body corporate or the owners of the building to manage the asbestos as well as safety harzards Okay, so we need to make sure there’s a asbestos register in place and a management plan to look after them so that’s you can either contact Sydney or myself and we can help you out in those areas from there so what we’ll do we’ll “re going through” one of the other reports and the other sections what need to look at.Alright so we were looking at the asbestos report andthen we were seeming in each area and to see and howwe can identify what responsibilities in the building and to be addressed where the asbestos sheeting is and how to manage that so once we’ve got that in our report thatneeds to be put into a registry so if we look in…so an asbestos conduct design so whoever is necessary to an onsite needs to be aware of the the asbestos on site and what risks are they gonna to…or what programme are they gonna to do to minimise the risk so they don’t disturb that asbestos also there is another document in here as well where did it go no, it’s not that one asbestos cross-file, okay so…not it’s gone Alright, so whatever part of the building so we’re looking at that there okay, so it says asbestos administration program , now the other part of the register that identified where the asbestos was in the building and whatcondition it was in so then that way you’ve got that full management of the area so you know where the asbestos is and the contractors only knew where that is alright, so if we go back to our other slouse in now this is where we’re talking about the asbestos register so that identifies where the extent of the asbestos is in the building and there’s someparts in some of the buildings in the olderbuildings, some can be in the paint the little openings are being put into the windows that encumber the windows into region, there’salso sometimes some asbestos in there that we’ve discovery and likewise some asbestos in the make-up so it’s quite amazing where that where that has been found that’s for sure alright, so formerly we got those sections in there so we’re looking at having an asbestos register in place so that’s what we looked at merely earlier on and we too run the contractors conduct mean in place so we know that whoever comeson the site the contractors know 1 not to disrupt it and 2 if they need to if there is gonna be any confusion then there needs to be adequate measures in place and monitoring so we don’t worried the fibers or we need to wet down the expanse so then all the materially is encapsulated, so that should give you a bit of an idea on how the asbestos strategy they go together, so you can either contact Sydney or myself and be able help you in meeting the requirements of the legislation

As found on YouTube

Book Now For Asbestos Removal In Newcastle